Value: £2m
Period: 20 weeks


Scope of works: Concrete break out of 2 service pits 270m long. Replace with deepened service pits. Works include the following: 1500m3 of muck away, 300t of re-bar, 2000m3 of concrete, fair faced upstands and plinths and 540m of drainage channel.

Rail