Value: £7.5 million
Period: 45 weeks


Scope of works: Green Man Lane consisted of 3 RC frames including all infrastructure works within the estate. Green Man Lane is part of the regeneration of Ealing which includes social and private housing. The 3no. Blocks varied in size and floors. Ranging from 2 to 6 floors. The area consisted of 16,200m2.

RC Frames