Heathrow - KAD TAXIWAY DRAINAGE


Aviation


Client:
FERROVIAL – Airside
Period:
20 weeks

Scope of works:
The installation of over 1200 linear metres of PCC drainage from single run 300mm dia up to twin 1050mm dia runs. Works include the full supply and installation of all PCC drain runs and in-situ RC inspection chambers, and working around congestive services within a challenging programme schedule within a live operational airport.

 