Saville Court Hotel


Basements/Civils


Period:
60 weeks

Scope of works:
OCS have been appointed by the Arora Group to construct an £18 million state of the art Hotel with a double story basement in the Royal Borough of Windsor. OCS have been appointed as the Principal Contractor for the works on site.


Project Constraints & Build sequence

OCS carried out some detailed pre construction studies and value engineered solutions for the client, saving both time and money for the client. Despite the scale of the project, the basement has 8000m2 foot print, is serviced with 2 tower cranes strategically positioned to service the site with a concrete placing boom used for slab pours. OCS, utilised our own in-house Peri Falsework to form fine smooth finished concrete beams to the ‘Ball Room Beams’. The ballroom, the largest of its type in the Europe, will be just one of the many centre pieces for this development. The concrete down stand beams were among many of the value engineered solutions provided by OCS that allowed the architect to use natural elements with the structure.


specialists in:

RC frames

 

Architectural Concrete

 

Basements/Civils

 

Aviation

 

Rail

 

Oliver Connell & Son Ltd
Zanrose House,
Perivale Park,
Horsenden Lane South,
Greenford, UB6 7RH

T. +44 (0) 20 8568 0001
E.