Twickenham


RC Frames


Period:
72 weeks

Scope of works:
OCS were appointed to construct mixed use development for a blue chip developer. The project is located within the confines of Twickenham Rail Station. This project showcased our ability to work within the rail environment and experience in the reinforced concrete sector also.

 

Project Constraints & Build sequence

The development is supported of piled foundations, formed within the station platforms. OCS value engineered the project to which requires a series of precast components constructed over the railway in single 54 hour possession. The structure thane takes shape with a mix of traditional reinforced concrete and post tension slabs.

 

All the temporary works on this project have been design checked to a CAT III Network Rail requirement. As with the works there are phases remaining, one which will require top down construction to form a basement and plant room. This is a live project within alive rail environment.


specialists in:

RC frames

 

Architectural Concrete

 

Basements/Civils

 

Aviation

 

Rail

 

Oliver Connell & Son Ltd
Zanrose House,
Perivale Park,
Horsenden Lane South,
Greenford, UB6 7RH

T. +44 (0) 20 8568 0001
E.