- Value:
- £2,700,000
- Period:
- 38 weeks
Scope of works:
Oliver Connell carried all of the ground works and RC frame works on this project. All of the internal concrete was High Quality Finishes with 80 % of the formwork having a board finish. In the ground floor we constructed 7 meter high one sided fair faced boarded walls.