- Period:
- 48 weeks
Scope of works:
OCS have been appointed by a blue-chip developer to construct a mixed use development on the sea front. The single story basement is formed using cantilever sheet piles and water proof concrete liner wall. The carpark podium slab is circa 6500m2 slab cast on our own in-house falsework to provide a smooth finish soffit. All of the elements within the basement are formed to a high standard of concrete finishes.